logo Rizzani de Eccher
Non è possibile visualizzare il filmato. Potrebbe essere necessario installare il plugin flash, puoi scaricarlo qui
RIZZANI DE ECCHER IN THE "RAIL BALTICA”
06/14/2019

 

A 430,5 million euro contract for the procurement of the Riga Station has been signed. It concerns the first 2,6 kilometres functional lot of the infrastructural megaproject called Rail Baltica.
It’s a very complex design & build contract, in which Rizzani de Eccher participates together with the Belgian company Besix and the Latvian company Rere, bringing significant added value due their experience in the large infrastructure sector.
The work consists in the conversion of the existing Riga station in one of the most modern railway terminal ever built before, with 26 escalators, 8 lifts and broad car parks.
The existing embankment, that currently runs through Riga, will be removed and a bypass for freight trains will be created.
Rail Baltica is a 870 kilometres greenfield railway system, with a value of 6 billion euros, with a track gauge that allows a direct connection of Estonia, Latvia and Lithuania to the European rail network
The project foresees 3 multimodal centres and 7 stations for passengers.
The work is financed by the European Community.

back

Search Group De Eccher's news archive sorted by year:

link homeVersione Russa
link a Deal